Budget Amount *help |
¥4,030,000 (Direct Cost: ¥3,100,000、Indirect Cost: ¥930,000)
Fiscal Year 2011: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2010: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2009: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2008: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
|
Research Abstract |
Based on fixed point theory, we have obtained the following outcomes.(1) We have derived a reduced-rank adaptive algorithm, analyzed its convergence properties, and shown that it ameliorates the convergence rate considerably with low computational complexity.(2) We have introduced the new concept of time-varying metric producing a general framework to analyze the convergence properties of a number of adaptive algorithms in a unified fashion.(3) We have imported the concept of feasibility splitting to adaptive signal processing, derived an efficient adaptive algorithm to exploit a variety of information that is expressed in multiple domains, analyzed its convergence properties, and shown its efficacy in SIMO/MIMO wireless communication systems.
|