Budget Amount *help |
¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
Fiscal Year 2009: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2008: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Research Abstract |
This study evaluated the influences of several factors on repair effects of desalination method which is one of the electrochemical corrosion control method for concrete structures by an experiment and a numerical analysis approach. Moreover, this study organized these evaluated results and systematized items which must be considered in preliminary survey and design for desalination method. Finally, a design flow of desalination method was proposed.
|