Budget Amount *help |
¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
Fiscal Year 2009: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2008: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Research Abstract |
A decision support technique for long-term reservoir operation was developed by use of global meteoro-hydrological information, which has been recently well developed worldwide. Deterministic and stochastic prediction methods of basin precipita-tion and streamflow for the coming three months were developed by utilizing global dis-tributional characteristics of pressure height, temperature and sea surface temperature. Decision support methods for long-term water release of a reservoir with consideration of the predictions were also developed, and then introduced to a real-time decision support system for reservoir operation.
|