Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2009: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2008: ¥2,600,000 (Direct Cost: ¥2,000,000、Indirect Cost: ¥600,000)
|
Research Abstract |
In this study, a field observation on a relation between turbulent kinetic energy dissipation rates ε and floc size was carried out in Ariake Bay by using a microstructure profiler and a waterproof microscope. As a result of the observation, ε at flood and ebb tide were higher than that at slack tide. On the other hand, the observed floc diameters were around 10-15μm and had not changed drastically for a tidal period. In addition, floc diameters estimated by the model proposed by Winterwerp (2002) roughly corresponded to the observed values.
|