Budget Amount *help |
¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2009: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2008: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Research Abstract |
A maximum likelihood method of estimating parameters or OD matrix of network equilibrium models using observed link flows (link flow count data) have been developed. Also, unified network equilibrium model of route choice and mode choice between road and public transportation using the nested logit model was formulated. Thus, a model system including the stochastic network equilibrium model and others for travel time reliability assessment was developed.
|