Budget Amount *help |
¥17,290,000 (Direct Cost: ¥13,300,000、Indirect Cost: ¥3,990,000)
Fiscal Year 2012: ¥3,640,000 (Direct Cost: ¥2,800,000、Indirect Cost: ¥840,000)
Fiscal Year 2011: ¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2010: ¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2009: ¥5,330,000 (Direct Cost: ¥4,100,000、Indirect Cost: ¥1,230,000)
|
Research Abstract |
Several “Retrotransmissive” materials were produced experimentally, with different optical structures and scales. Using these optical elements, “false image projectors” were constructed. The accuracy of the material and the resolution of displayed false image were evaluated by experiments, in correspond to the theory. Several phenomena such as the image disassemble, image distance estrangement were newly found.
|