Budget Amount *help |
¥17,550,000 (Direct Cost: ¥13,500,000、Indirect Cost: ¥4,050,000)
Fiscal Year 2011: ¥3,250,000 (Direct Cost: ¥2,500,000、Indirect Cost: ¥750,000)
Fiscal Year 2010: ¥8,190,000 (Direct Cost: ¥6,300,000、Indirect Cost: ¥1,890,000)
Fiscal Year 2009: ¥6,110,000 (Direct Cost: ¥4,700,000、Indirect Cost: ¥1,410,000)
|
Research Abstract |
To use the point cloud obtained by the 3D scanner for quality management, the authors have applied the point cloud analysis method and the comparison method of point cloud and 3D CAD models to the actual reinforcing work. As a result of the research, the authors have systematized the 3D CAD method to reduce the reinforcement model, and developed the method to neglect point cloud noise as well as the method to extract reinforcing bars from point cloud. Thus, they have verified the possibility of the comparison between 3D CAD models and the point cloud models.
|