Budget Amount *help |
¥9,360,000 (Direct Cost: ¥7,200,000、Indirect Cost: ¥2,160,000)
Fiscal Year 2012: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2011: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2010: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2009: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
|
Research Abstract |
This study aims to make database of architectural conversions by design survey abroad and to analyze their deign methods. The survey has been done during four years. In each year, field surveys and interviews with users were done to understand details of conversion. After investigation abroad, analyses of design methods in typical cases and consideration on the characteristics of conversion in various cities were made. During the study period of four years, totally approximate 400 works were surveyed and many unknown converted works could be found, producing fruitful research results.
|