Budget Amount *help |
¥17,550,000 (Direct Cost: ¥13,500,000、Indirect Cost: ¥4,050,000)
Fiscal Year 2011: ¥5,070,000 (Direct Cost: ¥3,900,000、Indirect Cost: ¥1,170,000)
Fiscal Year 2010: ¥5,980,000 (Direct Cost: ¥4,600,000、Indirect Cost: ¥1,380,000)
Fiscal Year 2009: ¥6,500,000 (Direct Cost: ¥5,000,000、Indirect Cost: ¥1,500,000)
|
Research Abstract |
We developed the 3 E (energy, environment and economy) model which is able to evaluate the achievement of low carbon-local society. The input-output model was applied to analyze the potential of carbon reduction up to 2030 based on local data of population, industrial structure, income, labors, technological level, energy demand and supply at Tsukuba city. The optimal cost minimum model was also used to analyze the utilization of photovoltaic cell, heat pump and biomass energy as well as the effect of local electricity load curves at Tsukuba-city and Ibaraki prefecture based on the geographic information system.
|