Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2011: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2010: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2009: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
|
Research Abstract |
In this research, we develop a time series analysis of kansei evaluation reflecting interactions between stimuli of any two time periods. Its applications to concrete townscape evaluation problems bring the following results. Subjects are partitioned into two types of groups, one of which consists of those who regard uniformity of facade color as important and the other of which consists of those who do not. Similarly, the former group seeks uniformity for building shapes, but the latter group remarks variation. Both groups prefer a townscape plan with building shapes common within each block but varying between any two blocks. Furthermore, the reproducibility of evaluations is studied.
|