Budget Amount *help |
¥3,250,000 (Direct Cost: ¥2,500,000、Indirect Cost: ¥750,000)
Fiscal Year 2011: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2010: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2009: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
|
Research Abstract |
First, I clarified the mutual relation between the problem of moral normativity and the problem of engineering ethics, and made mutual studies of these problems. So I suggested a new viewpoint to solve the problems of moral normativity and engineering ethics. Second, we should not pass down only knowledge when we teach engineering ethics. I clarified the essential problems of engineering ethics. Third, learners of engineering ethics can investigate the problems of engineering ethics voluntarily with the help of my study.
|