Budget Amount *help |
¥3,640,000 (Direct Cost: ¥2,800,000、Indirect Cost: ¥840,000)
Fiscal Year 2012: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2011: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2010: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2009: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
|
Research Abstract |
As a predictor of large CP violation in B decays, I was studying various possibilities in building the second generation B factory. The original design of the Super B factory luminosity was factor of 10 more than the existing B factory. I stressed the importance of building a Super B factory with at the luminosity at least a factor of 100 higher. The present design is a factor of 40 higher than the B factory. This research was carried out in collaboration with my collaborator for the past 30 years, I. Bigi. Unfortunately Bigi had a stroke and, at present, I am waiting for his recovery.
|