Budget Amount *help |
¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
Fiscal Year 2011: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2010: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2009: ¥3,120,000 (Direct Cost: ¥2,400,000、Indirect Cost: ¥720,000)
|
Research Abstract |
We clarified the strong influences of anthropogenic modification including port construction on the morphological variations in an integrated watershed composed of the Tedori River and the Kaetsu Coast on decadal scales. Additionally, we proposed a new wave-control method to attenuate the incident waves to port entrance by deeply dredging a navigation channel. Furthermore, we developed a local remote sensing system to measure the coastal morphology on sandy beaches in a cost efficient way.
|