Budget Amount *help |
¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
Fiscal Year 2011: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2009: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
|
Research Abstract |
This reseasrch proposes a practical thermal calculation method of typical windows with blinds as well as the database required for thermal calculation of typical windows. For double skin facades, a thermal calculation method which is practical enough to use in annual energy simulation tools is also proposed and the thermal performance characteristics were evaluated through simulations. Moreover, a thermal peak load simulation method with new design weather data sets which is suitable for glass buildings is proposed.
|