Budget Amount *help |
¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2009: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
|
Research Abstract |
Photogrammetry is easily available even in the construction sites where various materials and temporary equipment are scattered, because a digital camera is much more portable than the other measuring devices such as a total station or a 3D scanner. In order to utilize photogrammetry more highly in the A/E/C fields I improved measuring accuracy, illustrated error tendency, and concretely explained employment reliability. Furthermore I developed the system which cross-refers with construction information (ex. BIM models) and construction photographs.
|