The management of the history of the renovation works of the condominiums based on detailed cost estimate and bills of quantities
Project/Area Number |
21560648
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Town planning/Architectural planning
|
Research Institution | Toyo University |
Principal Investigator |
|
Research Collaborator |
FUJIKI Ryousuke 東洋大学, 工業技術研究所, 客員研究員
|
Project Period (FY) |
2009 – 2011
|
Project Status |
Completed (Fiscal Year 2011)
|
Budget Amount *help |
¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2011: ¥520,000 (Direct Cost: ¥400,000、Indirect Cost: ¥120,000)
Fiscal Year 2010: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2009: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
|
Keywords | 分譲集合住宅 / 大規模改修工事 / 実数精算契約 / 工事内訳明細書 / 工事履歴管理 / 工事履歴 |
Research Abstract |
This study received the cooperation of construction company group and the design offices and the unit owners associations of the condominiums, and investigated the actual condition of the construction contract in the renovation works of the condominiums. It was confirmed the remeasurement contract was widespread as the method of contracting construction. The feature of the construction contract in renovation work with a variable was arranged.
|