Budget Amount *help |
¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2011: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2010: ¥520,000 (Direct Cost: ¥400,000、Indirect Cost: ¥120,000)
Fiscal Year 2009: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
|
Research Abstract |
Design process of a translunar phasing orbit is investigated. The process is divided into two problems, an orbit connecting problem and a phase shifting problem. To solve the latter problem, a chart named"TM diagram"is developed. The chart is able to visualize the problem structure, and helps us to solve the problem graphically. The validity of the chart is shown by way of a practical design example.
|