Budget Amount *help |
¥4,030,000 (Direct Cost: ¥3,100,000、Indirect Cost: ¥930,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2009: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
|
Research Abstract |
In ring-porous hardwood species, we detected dramatic changes in IAA levels in the region of the cambial zone and its derivatives accompanying winter-bud break. Localized temperature controlling on the stem surface succeeded in inverting order between re-initiation of vessel formation in the treated portions and winter-bud break in hardwoods. In a diffuse-porous hardwood species, in which winter-bud broke prior to vessel formation, localized heating induced specific wood structures in xylem formed before the bud break.
|