Budget Amount *help |
¥27,170,000 (Direct Cost: ¥20,900,000、Indirect Cost: ¥6,270,000)
Fiscal Year 2010: ¥11,050,000 (Direct Cost: ¥8,500,000、Indirect Cost: ¥2,550,000)
Fiscal Year 2009: ¥16,120,000 (Direct Cost: ¥12,400,000、Indirect Cost: ¥3,720,000)
|
Research Abstract |
In order to predict various performances of structural concrete with time, this research aimed to enhance existing material models for wider applicability and higher accuracy. Through its enhancement, early age development process of cement and mineral admixtures can be predicted in a unified manner. In addition, environmental actions have been quantified by a wind tunnel experiment and on-site measurement so that the proposed simulation system can be applied to a concrete structure in real complex environmental conditions.
|