Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2009: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
|
Research Abstract |
In this research, to create the image and acoustic inspection robot for the concrete structures, we developed automated crack inspection system and impact acoustic approach for inspecting the degradation diagnosis of the concrete surfaces. We also developed wall-climbing robot for a narrow space that is not accessible for humans, such as small gaps between buildings, and we concluded that image and acoustic inspection can perform at the same time with the robot.
|