Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2010: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
Fiscal Year 2009: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Research Abstract |
The object of studying us was to evaluate experimentally the system adapted to the ubiquitous information society with which a maintenance and safety of waterside environment for the child who resides in a city to be familiar positively are compatible. As a result of analyzing a questionnaire to a child, the accident acknowledge changed with a habitation location or age. Moreover, the accident which does not appear in survey statistics of a public institution was confirmed. Based on these results of an investigation, we made the observation system as an experiment by the Build approach of the outdoor sensor network called a field server. The trial production system constituted the mesh network and succeeded in the acquisition of the sensor information.
|