Budget Amount *help |
¥3,250,000 (Direct Cost: ¥2,500,000、Indirect Cost: ¥750,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2009: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
|
Research Abstract |
1. Summary The measures for deterring harmful influences from the open competitive bid introduced recently instead of the selective competitive bid, concretely,(a) the qualification and participation criteria, (b) the inspection methods on abnormally low bids,(c)the overall evaluation bidding method, etc., have been examined, and the several instructions on methods of monitoring the contract process and deterring corruptions like bid-rigging or bribe, have been showed. 2. Practical Contributions (1) 2010 : Chiba City ("the Report of the Commission Concerning the Bid System") (2) 2011 : Nara City (advice to the Mayor on reforming the procurement systems), etc. 3. Publication Several articles and notes were made public in the academic and commercial magazines, and the article titled, "Modern issues on the Public Procurement Regime in Japan,"will be made public in 2011.
|