Research Abstract |
This project is analysis of the relationship between modern electricity supply industry and traditional ceramics industry in Japan. In particular, I have surveyed the Inawashiro Hydro-Electric Power Co, which was a company that sent the electric power from Fukushima to Tokyo for the first time. Insulators which imported by the company was defective because they were deceived by foreign engineers. Therefore, the localization of insulators had been hurry in Japan.
|