Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2011: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2010: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2009: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
|
Research Abstract |
We detected a crack structure with high crack density, whose direction is parallel to the epicenter alignment, in the region of the 2009 earthquake swarm at the Hakone volcano.Crustal fluid was included in the above crack structure during the earthquake swarm period. It was suggested that another crack structure was dominant during the period without earthquake swarm. This study presents that crustal structure possibly varies accompanied with occurrences of earthquake swarm.
|