Budget Amount *help |
¥3,120,000 (Direct Cost: ¥2,400,000、Indirect Cost: ¥720,000)
Fiscal Year 2010: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2009: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Research Abstract |
This study aimed at an establishment of seismic evaluation method based on energy. An input energy is known in seismic engineering field, and a hysteresis energy is known in fatigue strength field. As a result of this study, it was confirmed that the input energy is equivalent to the hysteresis energy. In addition, correlation base dondeformation between energies and failure was confirmed.
|