Budget Amount *help |
¥5,516,126 (Direct Cost: ¥4,243,174、Indirect Cost: ¥1,272,952)
Fiscal Year 2011: ¥966,126 (Direct Cost: ¥743,174、Indirect Cost: ¥222,952)
Fiscal Year 2010: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2009: ¥3,510,000 (Direct Cost: ¥2,700,000、Indirect Cost: ¥810,000)
|
Research Abstract |
This research project proposed two methods for(1) assessing the susceptibility of soft grounds to large residual consolidation settlement due to embankment loading from the results of laboratory test(compression index ratio and sensitivity ratio), and(2) predicting the long-term settlement that could occur in the future. Aiming at practical design development, these proposed methods were applied to actual sites being under construction in Japan and abroad where grounds are composed of soft clay, or ultra-soft peat.
|