Budget Amount *help |
¥16,770,000 (Direct Cost: ¥12,900,000、Indirect Cost: ¥3,870,000)
Fiscal Year 2012: ¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2011: ¥7,540,000 (Direct Cost: ¥5,800,000、Indirect Cost: ¥1,740,000)
Fiscal Year 2010: ¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
|
Research Abstract |
The purpose of this study is to create and finding the historical value of construction documentary film, and the prototype of a database system that allows the viewing the video scene-by-scene basis. By construction documentary film, it was possible to obtain a large number ofmechanization and construction details in the field of civil engineering, the knowledgeabout the changes in society surrounding the technology and transition of construction machinery. As a result, we were able to evaluate the construction of historicaldocumentary film. Furthermore, we have proposed a way for system to view the ConstructionMethod of the database to allow viewing for each scene.
|