Budget Amount *help |
¥17,550,000 (Direct Cost: ¥13,500,000、Indirect Cost: ¥4,050,000)
Fiscal Year 2012: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
Fiscal Year 2011: ¥6,240,000 (Direct Cost: ¥4,800,000、Indirect Cost: ¥1,440,000)
Fiscal Year 2010: ¥8,970,000 (Direct Cost: ¥6,900,000、Indirect Cost: ¥2,070,000)
|
Research Abstract |
The purpose of this research is to develop algorithm to detect road damage usingacceleration sensor installed GPS, and to clarify specifications in terms of road damageestimation proto-type system installed its algorithm.Focused on typical road damages such as road blockades caused and irregularities ofroad surface caused by earthquake and land slide disaster , damage detection algorithmusing the sensor is developed and is installed to smart phone application.We show to estimate inundation areas caused by localized torrential downpour inurban area to compare distribution of probe vehicle data during disasters with thosedata in normal times.
|