Budget Amount *help |
¥5,460,000 (Direct Cost: ¥4,200,000、Indirect Cost: ¥1,260,000)
Fiscal Year 2014: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2013: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2012: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2011: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2010: ¥2,860,000 (Direct Cost: ¥2,200,000、Indirect Cost: ¥660,000)
|
Outline of Final Research Achievements |
The water quality survey experiments involving field work in the rivers of 12 locations around the University built in two to three years following the curriculum, it was new offered. Analysis items incorporating the items that will appear on the exam to pollution prevention administrator (one water quality). Thus, to compensate experience student is a weak during qualification exam, it was possible to produced a pollution control managers in conjunction with extracurricular courses. In addition to was carried out graduate research theme that becomes the extension of the water quality survey experiment was constructed in this study some in the second half of research, events in the National Science Museum, etc. serve as the transmission of information and social contribution, in color hunting exhibition of 21_21 Design Site sponsored by It was exhibited.
|