Budget Amount *help |
¥3,380,000 (Direct Cost: ¥2,600,000、Indirect Cost: ¥780,000)
Fiscal Year 2012: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2011: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2010: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Research Abstract |
As the results of excavation on MINEZAWA and TAIRAMAE and surrounding site, it was verified that large-scale making of stone clubs of slate, in Jomon late and final periods. The subjects on utilization stone material, making techniques anddistribution system, were appreciated observation of artifacts and making measuredfigures. These stone clubs was made to common technique, elaborate hitting stone techniques, in each sites.
|