Budget Amount *help |
¥2,860,000 (Direct Cost: ¥2,200,000、Indirect Cost: ¥660,000)
Fiscal Year 2012: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2011: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2010: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
|
Research Abstract |
In England, since a new inspection system was introduced in 2005, they put an emphasis on reliability of school inspection process. In place of the exhaustive evaluation, interim assessment of schools was introduced. Similar to this, in Japan, we should see the picture of schools in exact details and tailor-made school improvement plan should be required.
|