Budget Amount *help |
¥4,030,000 (Direct Cost: ¥3,100,000、Indirect Cost: ¥930,000)
Fiscal Year 2012: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2011: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Research Abstract |
This project proposed a new PTS method with cycle sample shifting which can achieve the better PAPR performance than that for the conventional PTS method. The salient feature of proposed method is to enable the PAPR reduction with small computational complexity, which includes only the processing of cyclic time shifting in each cluster signal and summations of time domain signal for all clusters. This is different from the conventional PTS method, which requires both the processing of summation and multiplication.
|