The proposal of design method and maintenance management of overlay strengthened method for bridge deck
Project/Area Number |
22560458
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Civil engineering materials/Construction/Construction management
|
Research Institution | Hokkaido University |
Principal Investigator |
|
Project Period (FY) |
2010 – 2012
|
Project Status |
Completed (Fiscal Year 2012)
|
Budget Amount *help |
¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2012: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Keywords | 維持 / 管理 / 下面増厚補強工法 / 移動輪荷重 / 疲労寿命 / 割裂破壊 / アンカー筋 / 付着割裂破壊 / tooth model / 剥離破壊 / 鉄筋の疲労破断 / S-N関係 |
Research Abstract |
About the mortar used in an overlay strengthened method, the influence of the water was related to the bond strength estimated by the material strength and interface roughness. In this study, it was suggested that an anchor rod was adopted to prevent the concrete cover separation, and the resisting mechanism was shown. A traveling wheel load test was carried out for a real scale bridge deck to inspect an effectof the overlay strengthened method, and then the prediction equation of a fatigue life for punching shear failure was shown.
|
Report
(4 results)
Research Products
(20 results)