Project/Area Number |
22560467
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Civil engineering materials/Construction/Construction management
|
Research Institution | Kanazawa Institute of Technology |
Principal Investigator |
|
Project Period (FY) |
2010 – 2012
|
Project Status |
Completed (Fiscal Year 2012)
|
Budget Amount *help |
¥3,900,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥900,000)
Fiscal Year 2012: ¥390,000 (Direct Cost: ¥300,000、Indirect Cost: ¥90,000)
Fiscal Year 2011: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2010: ¥2,860,000 (Direct Cost: ¥2,200,000、Indirect Cost: ¥660,000)
|
Keywords | 鉄筋コンクリート / メンテナンス / プライオリティー / 塩害 / 腐食速度 / 点検 / 補修 |
Research Abstract |
It is important that a citizen can continuously use infrastructures with reliability, safety and comfortableness. Based on the above background, the objective of this study is to design a system of a maintenance plan to concrete structure with chloride induced corrosion. That is, the priority of the inspection is determined and the system which performed a necessary reasonable countermeasure is investigated. Therefore the next methods were developed; 1) It is understood where the structure whose deterioration rate is fast. 2) It is understood where the area or part whose deterioration rate is fast. 3) The steel corrosion rate in the existing structure is quantitatively checked in easiness. 4) The structure is repaired depending on the requirement performance. Finally the system designed the maintenance plan was suggested under these cooperate.
|