Budget Amount *help |
¥3,510,000 (Direct Cost: ¥2,700,000、Indirect Cost: ¥810,000)
Fiscal Year 2012: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Research Abstract |
The scalable spatio-temporal data model is designed for use in various urban design scenes. The 3D graphics, environmental analysis, VR and gaming software are tested to apply in the urban design process with a high regard for urban environment and urban activities. The same data package is successfully shared both in the urban landscape design and in the wind analysis.
|