Budget Amount *help |
¥3,470,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥570,000)
Fiscal Year 2012: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥1,000,000 (Direct Cost: ¥1,000,000)
|
Research Abstract |
In this research, by applying the generalized ridge regressionto the nonparametric regression, we changed the model so that the parameters which make Cp criterion the minimum can be obtained by closed forms. Usingthese results, we proposed non-iterative optimization method for smoothing method. Moreover, we applied the proposed smoothing method to several nonparametric regression models.
|