Research Abstract |
This project aimed to establish a development framework for constructing self-adaptive systems. In particular I focused on a programming framework for considering requirements models that self-adaptive systems should manage during run-time, and implemented a prototype of the programming framework. I also conducted construction of two self-adaptive systems as case studies, and evaluated that the framework supported self-adaptive systems construction by providing useful APIs for implementing components constituting control loops.
|