Research Abstract |
To realize a natural feature based Augmented Reality tracking method which is useful for reliability-critical work such as plant maintenance and decommissioning work support, methods for building accurate three dimensional point clouds by scanning work environment, creating realistic computer graphics with the point clouds, and predicting available area and accuracy of tracking were developed. Experimental evaluation was also conducted to compare the prediction result and real tracking accuracy.
|