Budget Amount *help |
¥3,900,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥900,000)
Fiscal Year 2012: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2011: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Research Abstract |
The first purpose of this research is to make practical use of 3D data the technique which can be used daily and to enable repair of more sculpture cultural properties to improve working efficiency, cost performance and quality.While quantifying and analyzing the effect of the cost and time in connection with manual labor and digital operation in actual repair as much as possible, I examined the contact point which the traditional working method and 3D technique can coexist,after taking technical tradition into consideration.
|