Budget Amount *help |
¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
Fiscal Year 2012: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2011: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2010: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Research Abstract |
This proposed measurement methodpresents four results as followings: 1)Three-dimensional deflection and stress fieldof asimply supported beamwith staticload, 2)Three-dimensional deflection and stress fieldof acantilever beamwith dynamic load, 3) Simultaneous visualization of stirring rods and stirred tank flow, 4)Three-dimensional visualization of hydrogen bubble method by means of digital holography using two-wavelength reconstruction. Therefore, it can be expected that obtained resultsappliesin practical use to designing and development ofproducts.
|