Budget Amount *help |
¥7,410,000 (Direct Cost: ¥5,700,000、Indirect Cost: ¥1,710,000)
Fiscal Year 2013: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2012: ¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
Fiscal Year 2011: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
|
Research Abstract |
Three kinds of basic time information which consist of calendar conversion, event index and basic chronological tables were constructed to realize analysis environment for time information at the same level of spatial information (GIS). A function to interpret character strings indicating a date and a function to link other resources through the "linked data" were introduced into the system for the basic information. Event index and basic chronological tables can be visualized in a time information system HuTime which was developed by our research group, and can be rearranged by newly developed data editor software for HuTime. Basic information and software developed in this study are provided from our web site.
|