Budget Amount *help |
¥17,680,000 (Direct Cost: ¥13,600,000、Indirect Cost: ¥4,080,000)
Fiscal Year 2013: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
Fiscal Year 2012: ¥5,200,000 (Direct Cost: ¥4,000,000、Indirect Cost: ¥1,200,000)
Fiscal Year 2011: ¥10,270,000 (Direct Cost: ¥7,900,000、Indirect Cost: ¥2,370,000)
|
Research Abstract |
We have developed an apertureless SNOM (a-SNOM), and have studied the polarization properties of the a-SNOM. As a result, we have succeeded to obtain a spatial resolution of approximately 10 nm. In addition, we have also succeeded to resolve a SNOM signal and a background signal. FDTD simulation explained our experimental results well, and consequently, we understood electric fields underneath apertureless probes. Furthermore, we developed a system for time-resolved SNOM measurement.
|