Budget Amount *help |
¥19,370,000 (Direct Cost: ¥14,900,000、Indirect Cost: ¥4,470,000)
Fiscal Year 2014: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2013: ¥4,940,000 (Direct Cost: ¥3,800,000、Indirect Cost: ¥1,140,000)
Fiscal Year 2012: ¥5,200,000 (Direct Cost: ¥4,000,000、Indirect Cost: ¥1,200,000)
Fiscal Year 2011: ¥7,670,000 (Direct Cost: ¥5,900,000、Indirect Cost: ¥1,770,000)
|
Outline of Final Research Achievements |
This research was analyzed about a factor of snow accumulated circumstances using modal photography in the air and a measurement investigation targeted for the uptown in Takasu. Specifically, the situation of the snow accumulated formation in in the block by difference where a vacant land in the block and block snow accumulated space are arrangement and the dwelling door site, the situation of the dwelling door arrangement and the snow accumulated formation by difference between dwelling Toma and the dwelling door form (the roof forms), the situation of the snow accumulated formation by a fusion action of sunshine, and the relation between a change and various factors of the snow accumulated formation judged from time series.
|