Budget Amount *help |
¥5,330,000 (Direct Cost: ¥4,100,000、Indirect Cost: ¥1,230,000)
Fiscal Year 2013: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2012: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2011: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
|
Research Abstract |
In this project, 2-D orthogonal transforms with trend vanishing moments were proposed, and then the theoretical analysis, design, implementation and applications were studied. First of all, a property of 2-D signal transforms, trend vanishing moment (TVM), was defined and the relation to the annihilation property for trend surfaces was clarified. Then, the concrete design and implementation methods were proposed for 2-D signal transforms with TVMs and the directional design and real-time implementation were realized. In addition, the significance of the proposed methods was verified through the application to image restoration. The extension to the oversampled case was also investigated.
|