• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

A Reference Model for Development of Production Scheduling Systems based on Business Process Modeling

Research Project

Project/Area Number 23560489
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeMulti-year Fund
Section一般
Research Field System engineering
Research InstitutionWaseda University

Principal Investigator

FUJIMURA SHIGERU  早稲田大学, 理工学術院, 教授 (00367179)

Project Period (FY) 2011 – 2013
Project Status Completed (Fiscal Year 2013)
Budget Amount *help
¥5,330,000 (Direct Cost: ¥4,100,000、Indirect Cost: ¥1,230,000)
Fiscal Year 2013: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2012: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2011: ¥2,600,000 (Direct Cost: ¥2,000,000、Indirect Cost: ¥600,000)
Keywords生産スケジューリング / 業務プロセスモデリング / システム化規範 / システム構築方法論 / 意思決定 / 生産管理 / オーダ
Research Abstract

The purposes of this research are to make a generalized business process model of production scheduling work and to build a systematization reference model based on it. To make such a business process clear, various kinds of production work are analyzed and a generalized business process model is created. According to it, specifications for implementation modules and interfaces are designed and a systematization reference model combining these is proposed. In this research, the following two items are achieved. 1) A systematization reference model is proposed that overcomes several problems while scheduling systems are implemented. 2) A novel concept of spiral evolutional systematization which synchronizes system development with an environment changed by kaizen of production process is proposed. A systemization reference model for small and medium-sized enterprises based on this concept is proposed and a production scheduling system based on the model is developed and evaluated.

Report

(4 results)
  • 2013 Annual Research Report   Final Research Report ( PDF )
  • 2012 Research-status Report
  • 2011 Research-status Report
  • Research Products

    (27 results)

All 2014 2013 2012 2011 Other

All Journal Article (5 results) (of which Peer Reviewed: 5 results) Presentation (19 results) Book (1 results) Remarks (2 results)

  • [Journal Article] A genetic algorithm with local search using activity list characteristics for solving resource constrained project scheduling problem with multiple modes2014

    • Author(s)
      Ikutaro Okada, Koji Takahashi, Wenqiang Zhang, Xiaofu Zhang, Hongyu Yang and Shigeru Fujimura
    • Journal Title

      IEEJ Transactions on Electrical and Electronic Engineering

      Volume: Vol.9, Issue 2 Pages: 190-199

    • Related Report
      2013 Final Research Report
    • Peer Reviewed
  • [Journal Article] Dynamic routing strategies for JIT production in hybrid flow shops2012

    • Author(s)
      Wei Weng, Xin Wei, Shigeru Fujimura
    • Journal Title

      Computers and Operations Research

      Volume: Vol.39, Issue 12 Pages: 3316-3324

    • Related Report
      2013 Final Research Report
    • Peer Reviewed
  • [Journal Article] Control methods for dynamic time based manufacturing under customized product lead times2012

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Journal Title

      European Journal of Operational Research

      Volume: Vol.218, Issue 1 Pages: 86-96

    • Related Report
      2013 Final Research Report
    • Peer Reviewed
  • [Journal Article] Multiobjective Process Planning and Scheduling Using Improved Vector Evaluated Genetic Algorithm with Archive2012

    • Author(s)
      Wenqiang Zhang, Shigeru Fujimura
    • Journal Title

      IEEJ Transaction On Electrical and Electronic Engineering

      Volume: Vol.7, Issue 3 Pages: 258-267

    • Related Report
      2013 Final Research Report
    • Peer Reviewed
  • [Journal Article] Multiupdate Mode Quantum Evolutionary Algorithm and Its Applications to Combination and Permutation Problems2012

    • Author(s)
      Xin Wei, Shigeru Fujimura
    • Journal Title

      IEEJ Transaction On Electrical and Electronic Engineering

      Volume: Vol.7, Issue 2 Pages: 166-173

    • Related Report
      2013 Final Research Report
    • Peer Reviewed
  • [Presentation] A Reference Model for Development of Production Scheduling Systems2014

    • Author(s)
      Shigeru Fujimura
    • Organizer
      4^<th> International Conference on Industrial Engineering and Operations Management
    • Place of Presentation
      Bali, Indonesia
    • Related Report
      2013 Final Research Report
  • [Presentation] A Reference Model for Development of Production Scheduling Systems2014

    • Author(s)
      藤村 茂
    • Organizer
      4th International Conference on Industrial Engineering and Operations Management(IEOM 2014)
    • Place of Presentation
      Bali, Indonesia
    • Related Report
      2013 Annual Research Report
  • [Presentation] 生産スケジューリング業務のシステム化の現状と課題2013

    • Author(s)
      藤村茂
    • Organizer
      電気学会システム研究会
    • Place of Presentation
      東京
    • Year and Date
      2013-06-27
    • Related Report
      2013 Final Research Report
  • [Presentation] スパイラル進化型スケジューリングシステム構築手法の適用評価2013

    • Author(s)
      藤村茂
    • Organizer
      電気学会システム研究会
    • Place of Presentation
      東京
    • Year and Date
      2013-02-22
    • Related Report
      2013 Final Research Report
  • [Presentation] Fuzzy based Multi Term Genetic Algorithm for Reentrant Flow Shop Scheduling Problem2013

    • Author(s)
      Shigeru Fujimura
    • Organizer
      The IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
    • Place of Presentation
      Bangkok, Thai
    • Related Report
      2013 Final Research Report
  • [Presentation] 生産スケジューリング業務のシステム化規範2013

    • Author(s)
      藤村 茂
    • Organizer
      平成25年電気学会電子・情報・システム部門大会
    • Place of Presentation
      北海道
    • Related Report
      2013 Annual Research Report
  • [Presentation] A Fuzzy-based Multi-Term Genetic Algorithm for Reentrant Flow Shop Scheduling Problem2013

    • Author(s)
      Shigeru Fujimura
    • Organizer
      The IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
    • Place of Presentation
      Bangkok, Thai
    • Related Report
      2013 Annual Research Report
  • [Presentation] スパイラル進化可能な中小企業向け生産スケジューリングシステム2012

    • Author(s)
      藤村茂
    • Organizer
      平成24年電気学会電子・情報・システム部門大会
    • Place of Presentation
      弘前
    • Year and Date
      2012-09-06
    • Related Report
      2013 Final Research Report
  • [Presentation] 生産スケジューリング業務のシステム化規範2012

    • Author(s)
      藤村茂
    • Organizer
      平成25年電気学会電子・情報・システム部門大会
    • Place of Presentation
      北見
    • Year and Date
      2012-09-05
    • Related Report
      2013 Final Research Report
  • [Presentation] ビジネスプロセスモデリングに基づく生産スケジューリングシステムの開発方法論2011

    • Author(s)
      藤村茂
    • Organizer
      平成23年電気学会電子・情報・システム部門大会
    • Place of Presentation
      富山
    • Year and Date
      2011-09-08
    • Related Report
      2013 Final Research Report
  • [Presentation] Development Methodology for Production Scheduling Systems using Business Process Modeling2011

    • Author(s)
      Shigeru Fujimura
    • Organizer
      21th International Conference on Production Research
    • Place of Presentation
      Stuttgart, Germany
    • Related Report
      2013 Final Research Report
  • [Presentation] Cooperated Integration Framework of Production Planning and Scheduling based on Order Life cycle Management2011

    • Author(s)
      Shigeru Fujimura
    • Organizer
      KEPS Workshop(Knowledge Engineering for Planning and Scheduling), 21st International Conference on Automated Planning and Scheduling
    • Place of Presentation
      Freiburg, Germany
    • Related Report
      2013 Final Research Report
  • [Presentation] Cooperated Integration Framework of Production Planning and Scheduling based on Order Life-cycle Management2011

    • Author(s)
      Shigeru Fujimura
    • Organizer
      Proceedings of the Workshop on Knowledge Engineering for Planning and Scheduling
    • Place of Presentation
      Freiburg, Germany
    • Related Report
      2011 Research-status Report
  • [Presentation] Development Methodology for Production Scheduling Systems using Business Process Modeling2011

    • Author(s)
      Shigeru Fujimura
    • Organizer
      Proceedings of the 21st International Conference on Production Research (ICPR21)
    • Place of Presentation
      Stuttgart, Germany
    • Related Report
      2011 Research-status Report
  • [Presentation] ビジネスプロセスモデリングに基づく生産スケジューリングシステムの開発方法論2011

    • Author(s)
      藤村 茂
    • Organizer
      平成23年電気学会 電子・情報・システム部門大会講演論文集
    • Place of Presentation
      富山大学
    • Related Report
      2011 Research-status Report
  • [Presentation] 生産スケジューリング業務のシステム化の現状と課題

    • Author(s)
      藤村 茂
    • Organizer
      電気学会 システム研究会
    • Place of Presentation
      東京
    • Related Report
      2013 Annual Research Report
  • [Presentation] ものの移動実績情報入力を利用したスパイラル進化型スケジューリングシステム

    • Author(s)
      藤村 茂
    • Organizer
      電気学会 システム研究会
    • Place of Presentation
      東京
    • Related Report
      2013 Annual Research Report
  • [Presentation] スパイラル進化可能な中小企業向け生産スケジューリングシステム

    • Author(s)
      藤村茂
    • Organizer
      平成24年電気学会電子・情報・システム部門大会
    • Place of Presentation
      弘前
    • Related Report
      2012 Research-status Report
  • [Presentation] スパイラル進化型スケジューリングシステム構築手法の適用評価

    • Author(s)
      菅又智通,衛シン,藤村茂
    • Organizer
      電気学会 システム研究会「スケジューリング技術の実問題への適用」
    • Place of Presentation
      東京
    • Related Report
      2012 Research-status Report
  • [Book] 電気学会技術報告書 "生産スケジューリングシステム導入ガイド~失敗しないシステム開発のために~",生産スケジューリング業務のシステム化規範に関する協同研究委員会編2014

    • Publisher
      (2014年6月発刊予定)
    • Related Report
      2013 Final Research Report
  • [Remarks]

    • URL

      http://www.fujimura-lab.org/

    • Related Report
      2013 Final Research Report
  • [Remarks]

    • URL

      http://www.ieej-scheduling.scheduler.jp.net/

    • Related Report
      2013 Final Research Report

URL: 

Published: 2011-08-05   Modified: 2019-07-29  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi