Development of Method of Improving Inspectabilty of Existing Steel Girder Bridges
Project/Area Number |
23560570
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Structural engineering/Earthquake engineering/Maintenance management engineering
|
Research Institution | Kyushu Institute of Technology |
Principal Investigator |
YAMAGUCHI Eiki 九州工業大学, 工学(系)研究科(研究院), 教授 (90200609)
|
Project Period (FY) |
2011 – 2013
|
Project Status |
Completed (Fiscal Year 2013)
|
Budget Amount *help |
¥5,070,000 (Direct Cost: ¥3,900,000、Indirect Cost: ¥1,170,000)
Fiscal Year 2013: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2012: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2011: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
|
Keywords | 端横桁 / 鋼鈑桁橋 / 腐食 / 点検孔 / ダブリング補強 / 補剛材 / 孔 / 維持管理 |
Research Abstract |
The objective is to improve the inspectability of an end cross girder of a steel bridge. The finite element method is the mainstay, but the analysis of the whole bridge is an insurmountable task. The end cross girder model is therefore constructed first. Since the end cross girder is very susceptible to corrosion, the influence of corrosion on the load-carrying capacity of the end cross girder is investigated, showing that the corrosion can deteriorate the load-carrying capacity considerably. For the prevention, inspection is essential, but in many bridges it is not easy as the end cross girder is so close to a parapet. In the present study, the setup of an inspection hole is considered to solve the problem. To this end, the influence of an inspection hole on the load-carrying capacity is studied. It is found that not only the size and the shape but also the location influences load-carrying capacity. Reinforcement methods are then investigated and their effectiveness is revealed.
|
Report
(4 results)
Research Products
(8 results)