Budget Amount *help |
¥5,330,000 (Direct Cost: ¥4,100,000、Indirect Cost: ¥1,230,000)
Fiscal Year 2013: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2012: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2011: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Research Abstract |
Recently, bicycle is evaluated as eco-friendly transport. Therefore, there are many researches that analyses the method to establish a better traffic environment for bicycle. However, there are few researches to consider the desirable space in road for bicycle from the viewpoint of safety. Based on this background, this study conducts the risk analysis of bicycle traffic moving on the roadway or the pedestrian road. Results of this analysis could evaluate the safety of bicycle that is moving on the roadway. By utilizing this result, some approach is tried in order to change the moving paths from the pedestrian road to the roadway. If there are many bicycles on the roadway, it could be thought that new bicycle would not choose the pedestrian road but choose the roadway. Effect of this incentive was clarified through the experiment that changes the number of bicycle on the roadway.
|