Budget Amount *help |
¥5,460,000 (Direct Cost: ¥4,200,000、Indirect Cost: ¥1,260,000)
Fiscal Year 2014: ¥390,000 (Direct Cost: ¥300,000、Indirect Cost: ¥90,000)
Fiscal Year 2013: ¥390,000 (Direct Cost: ¥300,000、Indirect Cost: ¥90,000)
Fiscal Year 2012: ¥390,000 (Direct Cost: ¥300,000、Indirect Cost: ¥90,000)
Fiscal Year 2011: ¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
|
Outline of Final Research Achievements |
We investigated about the index for metal texture selection, as example of achromatic metal series with mirror-finished or shot-blasting-finished. It was able to systematize by relationship between evaluation terms from the user and physical factors, which are surface roughness, shot materials and metal species. The causality of 92 terms in this investigation was evaluated by experts. The result was analyzed by DEMATEL method aim to classify each term into hierarchy structure depending on 4 abstractions. Subsequently, samples of metal texture were evaluated by users using 35 terms as onomatopoeia, which are answerable intuitively and easily. The result was analyzed by Correspondence analysis to conduct between these terms and physical characteristics. As the result, we proposed systematic index with path and numeric to express the relationship. It is traceable with flow type from either concept term or inspiration of metal texture.
|