Budget Amount *help |
¥3,900,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥900,000)
Fiscal Year 2012: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2011: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
|
Research Abstract |
The objective of this research is to develop "multi-high-speed AFM" with the capability to map physical-properties in liquid. This technique enables the simultaneous imaging of the surface topography, energy dissipation and elasticity of materials. We experimentally demonstrated the high-speed imaging of topography, energy dissipation and elasticity at a scan speed of 10 frames/s in water.
|