Budget Amount *help |
¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
Fiscal Year 2013: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2012: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2011: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
|
Research Abstract |
The purpose of this study is to develop a general-purpose scheduling optimization engine that can be applied to various scheduling problems arising in real applications. We extended the resource constrained project scheduling problem (RCPSP) model and implemented a metaheuristic algorithm for the model. Using benchmark instances, we evaluated the performance of the optimization engine developed in this study, and also confirmed that the engine can handle some complicated scheduling problems.
|